𝗡𝗢𝗧𝗜𝗖𝗘 𝗢𝗙 𝗦𝗧𝗨𝗗𝗬 𝗖𝗢𝗠𝗠𝗘𝗡𝗖𝗘𝗠𝗘𝗡𝗧
Ontario Transportation (MTO) has retained
Stantec to complete the 𝗣𝗿𝗲𝗹𝗶𝗺𝗶𝗻𝗮𝗿𝘆 𝗗𝗲𝘀𝗶𝗴𝗻, 𝗗𝗲𝘁𝗮𝗶𝗹 𝗗𝗲𝘀𝗶𝗴𝗻, 𝗮𝗻𝗱 𝗖𝗹𝗮𝘀𝘀 𝗘𝗻𝘃𝗶𝗿𝗼𝗻𝗺𝗲𝗻𝘁𝗮𝗹 𝗔𝘀𝘀𝗲𝘀𝘀𝗺𝗲𝗻𝘁 (𝗘𝗔) 𝗦𝘁𝘂𝗱𝘆 𝘁𝗼 𝗮𝗱𝗱𝗿𝗲𝘀𝘀 𝘁𝗵𝗲 𝗳𝘂𝘁𝘂𝗿𝗲 𝗻𝗲𝗲𝗱𝘀 𝗼𝗳 𝘁𝗵𝗲 𝗛𝗶𝗴𝗵𝘄𝗮𝘆 𝟯 𝗰𝗼𝗿𝗿𝗶𝗱𝗼𝗿 𝗳𝗿𝗼𝗺 𝗛𝗶𝗴𝗵𝘄𝗮𝘆 𝟰 near the village of Talbotville in the Township of Southwold to Centennial Road in the City of St. Thomas and Municipality of Central Elgin
The study has been divided into two group work projects (GWPs), which include the following scope of work:
1. 𝙃𝙞𝙜𝙝𝙬𝙖𝙮 3 𝙏𝙬𝙞𝙣𝙣𝙞𝙣𝙜
- Construction of two additional lanes (i.e., twinning) along Highway 3 from Ron McNeil Line to Centennial Avenue (approximately 9.4 km)
- Preliminary Design, Detail Design, and Group ‘B’ Class EA (GWP 3041-22-00)
2. 𝙏𝙖𝙡𝙗𝙤𝙩𝙫𝙞𝙡𝙡𝙚 𝘽𝙮𝙥𝙖𝙨𝙨
- Construction of a new Talbotville Bypass from Highway 4 to Highway 3 at Ron McNeil Line
- Widening of Highway 4 from two (2) to four (4) lanes from Clinton Line to the new Talbotville Bypass (approximately 2.4 km)
- Preliminary Design, Detail Design, and Group ‘A’ Class EA (GWP 3042-22-00)
If you wish to provide comments, have your name added to the study mailing list, or have questions about this project, please email:
comments@highway3elgin.ca